Provides superior load-bearing capacity and long-term pavement stability.
Uniformly graded for excellent compaction and moisture resistance.
Engineered to withstand heavy traffic and harsh weather conditions.

Base Material: How to Repair the Road Base

A strong road starts with a solid base. Deep potholes must be repaired from the bottom up — not just filled with asphalt. Here's how to do it right:

What You’ll Need

  • G5 Stone
  • Cement (42.5 N)
  • Water
  • Wheelbarrow, shovel, scoop
  • Ride-on vibrating roller

Mix Ratios

  • Small Batch:
    1 wheelbarrow G5 Stone (±120 kg) + 4 full scoops of cement + ±7.2 litres water
  • Large Batch:
    1 cubic meter G5 Stone (±1700 kg) + 1 x 50 kg cement bag + ±105 litres water
  • General Rule:
    Mix G5 Stone with ±4% cement and just enough water to make it moist and compactable — not wet like concrete.
  •  

Step-by-Step Repair Process

  • Excavate the damaged area and remove loose debris.
  • Fill the hole with your prepared base mix.
  • Rake the surface evenly.
  • Compact using a vibrating roller while lightly applying water.
  • Cure for 3–5 days, keeping the area moist.
  • Apply tack coat before laying asphalt.

Tip: Using base material saves money — it’s more cost-effective than cold asphalt.